From: Monday 14 January 2019
To: Friday 31 July 2020
Last updated 18:42 Monday 09 December 2019 : Delays are possible.
Works | Borough
[A1055] Watermead Way (N17) (All Directions) at the junction of [A503] Hale Road and The Hale and Ferry Lane and Monument Way - Various lane restrictions and phased closures for a major Borough Highway Scheme. [A503]
From: Monday 28 October 2019
To: Thursday 12 December 2019
Last updated 16:00 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A13] Canning Town Flyover (Eastbound) at the junction of [A124] Barking Road - [A13] off-slip to [A124] closed during emergency Cadent Gas works. Additionally, [A13] East India Dock Road (Eastbound) at the junction of [A1263] Leamouth Road, lane restrictions.
From: Monday 02 December 2019
To: Wednesday 18 December 2019
Last updated 20:42 Monday 09 December 2019 : Minor delays on approach to the works.
Works | Utility
[A21] Bromley Road (SE6) (All Directions) at the junction of Bellingham Road - There are temporary traffic signals in operation for UK Power Networks works.
From: Thursday 11 April 2019
To: Thursday 30 September 2021
Last updated 17:47 Monday 09 December 2019 : Use alternative routes.
Infrastructure Issue | Other
[A306] Hammersmith Bridge (W6) (Both Directions) - The bridge remains closed to all motorised traffic following the discovery of structural damage during routine checks.
From: Thursday 21 November 2019
To: Sunday 05 January 2020
Last updated 19:48 Monday 09 December 2019 : There are currently no traffic delays related to this event.
Special and Planned Events | Exhibition
Winter Wonderland, Hyde Park (W1) - Expect larger numbers of pedestrians in the area than usual. North Carriage Drive (Westbound) between Victoria Gate and Cumberland Gate, closed until approximately 06:00 Friday 3 January.
From: Sunday 06 October 2019
To: Friday 20 December 2019
Last updated 17:32 Monday 09 December 2019 : Traffic is currently flowing well.
Works | TfL
[A406] Bowes Road (North Circular Road) (N13) (Both directions) at the junction of Palmerston Road - Carriageway and landscaping works are taking place from Monday 07 October to Friday 20 December. Lane closures in place daily 10:00-15:30hrs and 20:00hrs-05:00hrs. In addition, there is a full closure of Palmerston Road. Temporary Signals will also be in place between 18th November and 6th December.
From: Monday 05 January 2015
To: Saturday 31 July 2021
Last updated 15:25 Monday 09 December 2019 : Seek other routes.
Works | TfL
[A3] Arthur Street (EC4R) (Both Directions) between Martin Lane and King William Street - Road closed to facilitate Bank Station upgrade works. Diversion routes are signed. Find out more about Bank and Monument works
From: Wednesday 04 January 2017
To: Saturday 31 December 2022
Last updated 15:57 Monday 09 December 2019 : Delays are possible
Works | Utility
[A3211] Victoria Embankment (EC4) (Both Directions) between [A201] Blackfriars Bridge and Horse Guards Avenue - Various carriageway restrictions have been implemented for the Tideway works. A diversion is in place for traffic wishing to access [A3211] Victoria Embankment westbound. Northbound traffic on [A201] Blackfriars Road is diverted via [A3200] Stamford Street, [A301] Waterloo Bridge, [A4] Strand, Arundel Street and Temple Place. Southbound traffic on [A201] New Bridge Street is diverted via [A4] Fleet Street, [A4] Strand, Arundel Street and Temple Place. Friday 27 September, [A3211] Victoria Embankment (Westbound) at the junction of Temple Avenue, lane one (of two) closed between approximately 22:00 and 05:00. The Cycle Superhighway has a new layout. Find out more about the road changes at Victoria Embankment.
From: Sunday 06 January 2019
To: Friday 30 April 2021
Last updated 16:06 Monday 09 December 2019 : Seek other routes.
Works | Other
Melton Street (NW1) (Both Directions) at the junction of Euston Road - HS2 will be relocating the Euston Station Taxi rank from its current location in the station basement to the east side of Euston Square Gardens. The road is closed, except for taxi access to the new rank.
From: Thursday 11 January 2018
To: Tuesday 30 June 2020
Last updated 15:20 Monday 09 December 2019 : Seek other routes where possible.
Works | Borough
[A4201] Park Crescent (NW1) (Southbound) at the junction of [A501] Marylebone Road - Closed due to works by Westminster City Council.
From: Wednesday 08 May 2019
To: Tuesday 31 March 2020
Last updated 15:15 Monday 09 December 2019 : Traffic delays are possible, caution is also advised on the approach.
Works | Borough
The West End Project, [A400] Gower Street and [A400] Bloomsbury Street (WC1) (All Directions) between [A501] Euston Road and Princes Circus - Various lane closures in place on [A400] Gower Street, [A400] Bloomsbury Street, [A40] High Holborn and [A40] St Giles High Street for borough works for 'The West End Project'.
From: Monday 09 December 2019
To: Ongoing
Last updated 17:55 Monday 09 December 2019 : Use an alternative route. Traffic is flowing well.
Works | Emergency
[A200] Jamaica Road (SE16) (Westbound) at the junction of Southwark Park Road - Lane one (of two) closed on Jamaica Road and Southwark Park Road is closed in both directions to facilitate emergency gas works.
From: Monday 12 August 2019
To: Thursday 30 April 2020
Last updated 15:18 Monday 09 December 2019 : Use other routes where possible.
Works | Borough
[A40] Princes Circus (WC1V/WC2H) (All Directions) at the junction of High Holborn and Shaftesbury Avenue - Lane restrictions in place due to works on behalf of Camden Council. From 08:00 on Thursday 7th November until mid January, Shaftesbury Avenue will be closed between High Holborn and Bloomsbury Street. Bloomsbury Street is also reduced to one lane.
From: Tuesday 03 December 2019
To: Friday 13 December 2019
Last updated 17:14 Monday 09 December 2019 : Use alternative routes. Traffic is flowing well on diversion.
Works | Emergency
Rye Lane (SE15) (Northbound) at the junction of Hanover Park - The road is closed due to emergency gas works.
From: Friday 25 October 2019
To: Monday 16 December 2019
Last updated 18:41 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A1055] Meridian Way (N9/N18) (Northbound) between [A1055] Conduit Lane and Ardra Road - Closed until early December during UKPN works.
From: Wednesday 04 December 2019
To: Wednesday 11 December 2019
Last updated 21:08 Monday 09 December 2019 : Expect delays on the approaches to the works in both directions, especially at peak times.
Works | Utility
[A5] Edgware Road (W2) (All Directions) at the junction of Church Street - Two-way temporary signals in place due to Thames Water works. Church Street is also closed in both directions.
From: Monday 30 September 2019
To: Sunday 05 January 2020
Last updated 15:58 Monday 09 December 2019 : Use an alternative route. Delays are possible.
Works | Utility
Old Broad Street (EC2N/EC2M) (Southbound) at the junction of London Wall - Road closed to facilitate Thames Water works.
From: Monday 09 December 2019
To: Tuesday 10 December 2019
Last updated 20:13 Monday 09 December 2019 : Seek other routes.
Works | Borough
[A1010] Hertford Road (EN3/EN8) (All Directions) at the junction of Bullsmoor Lane - Road closure due to resurfacing works.
From: Tuesday 26 November 2019
To: Sunday 15 December 2019
Last updated 19:15 Monday 09 December 2019 : Use an alternative route.
Works | Utility
[B412] Westbourne Park Road (W11) (All Directions) at the junction of Portobello Road - Road closed due to gas main replacement works.
From: Wednesday 27 November 2019
To: Wednesday 11 December 2019
Last updated 15:57 Monday 09 December 2019 : Use an alternative route.
Works | Utility
Denmark Street (WC2H) (All Directions) at the junction of [A40] St Giles High Street - The road is closed to facilitate Cadent Gas works.
From: Monday 09 December 2019
To: Tuesday 10 December 2019
Last updated 21:09 Monday 09 December 2019 : Restrictions are in operation. Delays are possible.
Works | Borough
[A302] Parliament Square (SW1A) (All Directions) at the junctions of Broad Sanctuary and St Margaret Street - There will be lane closure of the Northern section of Parliament Square, a brief southbound closure at Broad Sanctuary and St Margaret Street between 01:00 and 02:00 due to works in the area.
From: Monday 27 May 2019
To: Saturday 14 December 2019
Last updated 21:07 Monday 09 December 2019 : Traffic is flowing well.
Works | Utility
[A215] Norwood Road (Both Directions) approaching [A205] Christchurch Road - Lanes two and three (of three) southbound and lane two (of two) northbound are closed due to Thames Water works. Temporary signals are in operation on Norwood Road at Christchurch Road and on Norwood Road at Elmcourt Road.
From: Monday 12 March 2018
To: Sunday 05 January 2020
Last updated 16:16 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A3] North Side Wandsworth Common (SW18) (Westbound) at the junction of Huguenot Place and Woodwell Street - Lane one (of four) is closed for road works.
From: Saturday 13 October 2018
To: Friday 31 January 2020
Last updated 17:37 Monday 09 December 2019 : Delays are possible.
Special and Planned Events | Construction Activity
[B210] Artillery Place (Both Directions) at the junction of Belford Grove - Two way temporary traffic signals to facilitate construction works.
From: Thursday 25 July 2019
To: Thursday 23 January 2020
Last updated 16:19 Monday 09 December 2019 : Delays are possible.
Works | Other
[A3205] Battersea Park Road (SW8/SW11) (All Directions) at the junction of Kirtling Street - Various lane closures will be in place to facilitate a long-term junction improvement scheme (a single lane in each direction will be maintained at all times). There will also be alternate, bi-directional closures of the Cycleway to facilitate the works. Restrictions will remain in situ 24/7.
Provisional dates:
From: Monday 01 January 2018
To: Wednesday 01 January 2020
Last updated 14:29 Monday 09 December 2019
Works | TfL Works
Gyrathory changes to two way flows
Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021
Last updated 14:29 Monday 09 December 2019
Works | TfL Works
Twickenham Bridge, Bridge Concrete repairs and waterproofing.
From: Monday 29 May 2017
To: Monday 30 November 2020
Last updated 15:24 Monday 09 December 2019 : Traffic delays are possible throughout the course of these works.
Works | TfL
[A4] Brompton Road (SW3) (Westbound) after the junction of [A4] Knightsbridge (Scotch Corner) - Lane one (of three) closed until late 2020 during station upgrade works.
From: Tuesday 03 May 2016
To: Tuesday 03 March 2020
Last updated 15:16 Monday 09 December 2019 : Traffic delays are possible on approach.
Works | Borough
[A4] Knightsbridge (Both Directions) between Wilton Place and William Street - The carriageway is restricted for the redevelopment of 55-91 Knightsbridge and the Berkeley Hotel. The westbound bus lane is currently closed from Old Barrack Yard to William Street until 30/09/19. More information available on Westminster council's website.
From: Monday 18 March 2019
To: Sunday 23 February 2020
Last updated 19:56 Monday 09 December 2019 : Westbound traffic is slow with queues from Northern Roundabout. Expect delays.
Works | TfL
Cycle route Wood Lane to Acton, [A40] Western Avenue (Westbound) between [A219] Wood Lane (White City) and Gypsy Corner (A4000) - Lane one restriction in place at Old Oak Road. [A4000] Leamington Park (Westbound) at the junction of [A40] (Gypsy Corner), closed until Late February More information on the new cycle route.
Provisional dates:
From: Friday 01 September 2017
To: Friday 31 December 2021
Last updated 14:29 Monday 09 December 2019
Works | TfL Works
CS11 and Brent Cross Cricklewood Regeneration
From: Monday 09 December 2019
To: Ongoing
Last updated 20:56 Monday 09 December 2019 : Traffic is flowing well on approach. Recovery will commence at 0030hrs.
Traffic Incidents | Collision
[A406] North Circular Road (IG11/E12) (Southbound) approaching Barking Flyover - Lanes one (of three) is closed due to a collision.
From: Saturday 29 August 2015
To: Wednesday 04 August 2021
Last updated 16:02 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A3] King William Street (EC3R/EC4R) (northbound) between London Bridge and Arthur Street - Lane one is closed from London Bridge to Arthur Street until 2021. Find out more about the Bank & Monument capacity upgrade on the TfL website
From: Monday 09 December 2019
To: Tuesday 10 December 2019
Last updated 18:32 Monday 09 December 2019 : Traffic is flowing well.
Special and Planned Events | Concert
O2 Arena - Michael Bublé in concert. Expect delays on Millennium Way, West Parkside and Edmund Halley Way after the event has finished.
From: Monday 05 March 2018
To: Tuesday 31 March 2020
Last updated 15:20 Monday 09 December 2019 : Traffic congestion is likely especially during peak times whilst these works continue.
Works | Borough
The West End Project, [A400] Tottenham Court Road (W1T) (Both Directions) between [A40] Oxford Street and [A501] Euston Road - Various lane closures and temporary signals in place due to "The West End Project". More information on Camden council's website.
From: Thursday 04 July 2019
To: Thursday 30 April 2020
Last updated 17:34 Monday 09 December 2019 : Delays are possible.
Works | TfL
Cycleway 4, [A200] Jamaica Road and [A200] Tooley Street (Both Directions) between [A200] Lower Road (Rotherhithe roundabout) and [A100] Tower Bridge Road - Various restrictions until approximately April 2020 during the construction of Cycleway 4. More information.
From: Monday 01 July 2019
To: Friday 30 April 2021
Last updated 16:05 Monday 09 December 2019 : Delays are possible.
Special and Planned Events | Construction Activity
[A302] Grosvenor Place (SW1) (Northbound) between Wilton Street and Chester Street - Lane one (of three) closed during nearby building works. Additionally, lane two (of three) also closed between approximately 22:00 and 06:00 each night, Sunday to Friday, inclusive.
From: Tuesday 03 December 2019
To: Ongoing
Last updated 14:42 Monday 09 December 2019 : Care required on approach. There are currently no delays to traffic.
Traffic Incidents | Collision
[A5] Edgware Road (W2/W1H) (All Directions) at the junction of Sussex Gardens - The pedestrian crossing on Sussex Gardens is closed following a collision causing damage to the traffic signals.
From: Monday 01 April 2019
To: Friday 13 December 2019
Last updated 14:55 Monday 09 December 2019 : Traffic delays are possible throughout the duration of the work.
Works | Borough
[A4] Piccadilly (W1) (Westbound) approaching the junction of Duke Of Wellington Place (Hyde Park Corner) - Lane one (bus lane) closed during the installation of railings.
From: Monday 07 January 2019
To: Sunday 28 February 2021
Last updated 16:06 Monday 09 December 2019 : Delays may occur on the approach.
Works | TfL
Old Street Junction (All Directions) - The former Old Street roundabout has switched to two-way traffic. More information.
From: Monday 23 July 2018
To: Wednesday 20 July 2022
Last updated 16:07 Monday 09 December 2019 : Traffic congestion is possible.
Works | Utility
Tideway Tunnel Project, [A3212] Chelsea Embankment (SW11/SW3) (Both Directions) between Embankment Gardens and Chelsea Bridge - Various lane restrictions during Tideway Tunnel Project works. A new road layout in place, which remains for the duration of the works. More information on the Thames Tideway website.
From: Tuesday 30 April 2019
To: Friday 01 April 2022
Last updated 16:05 Monday 09 December 2019 : Delays are possible.
Special and Planned Events | Construction Activity
[A401] Shaftesbury Avenue (W1D/W1J) (Northbound) at the junction of Piccadilly Circus - Carriageway restrictions in place due to works.
From: Wednesday 27 November 2019
To: Ongoing
Last updated 17:53 Monday 09 December 2019 : There are no reported delays.
Works | Emergency
[A215] South Norwood Hill (SE25) (All Approaches) at the junction of High Street - Temporary signals in operation due to a burst water main.
From: Tuesday 29 May 2018
To: Tuesday 31 December 2019
Last updated 17:48 Monday 09 December 2019 : Delays are possible.
Works | Other
[A244] Hounslow Road (TW14/TW13) (Both Directions) between New Road and [B3377] Hanworth Road - Due to collaborative works on behalf of Network Rail and Hounslow council, a full carriageway closure is in place for all traffic and pedestrians at this location, until approximately late 2019. In addition, single alternate lane traffic with temporary traffic signals are in operation.
From: Wednesday 29 May 2019
To: Thursday 27 August 2020
Last updated 16:05 Monday 09 December 2019 : Delays are possible.
Works | Borough
[A112] Connaught Road (E16) (All Directions) at the junction of Hartmann Road - Temporary traffic signals are in place to facilitate Borough development works.
From: Friday 06 December 2019
To: Wednesday 11 December 2019
Last updated 17:54 Monday 09 December 2019 : Traffic is flowing well.
Works | Emergency
[A217] Garratt Lane (SW18) (All Directions) at the junction of Earlsfield Road - Temporary signals in operation to facilitate emergency Thames Water works.
From: Thursday 14 September 2017
To: Thursday 31 December 2020
Last updated 15:25 Monday 09 December 2019 : Traffic delays are possible.
Special and Planned Events | Construction Activity
[A400] Charing Cross Road (WC2H) (Southbound) between Tottenham Court Road Underground Station South Plaza and Denmark Street - Width restriction for the consolidated building development until late into 2020.
From: Monday 01 October 2018
To: Sunday 01 March 2020
Last updated 16:06 Monday 09 December 2019 : Delays are possible.
Works | Borough
[A308] Kingston Vale (SW15) (Both Directions) at the junction of Robin Hood Place - There are various lane closures in place due to works for the Go Cycle/Mini Holland cycle lane scheme.
From: Monday 09 December 2019
To: Friday 13 December 2019
Last updated 16:19 Monday 09 December 2019 : No reported delays at this time.
Works | Emergency
[B317] North End Road (W14/SW6) (All Directions) between Eustace Road and Lillie Road - The carriageway is restricted with the use of temporary traffic signals due to a burst water main.
From: Monday 09 December 2019
To: Thursday 12 December 2019
Last updated 19:36 Monday 09 December 2019 : No reported delays.
Works | Emergency
[A234] Crystal Palace Park Road (SE26) (All Directions) at the junction of Lawrie Park Road - Temporary signals in operation due to a burst water main.
From: Monday 09 December 2019
To: Ongoing
Last updated 18:17 Monday 09 December 2019 : Use caution. Traffic is flowing well.
Hazard(s) | Fire
[A2016] Bronze Age Way (DA17) (Eastbound) at the junction of Crabtree Manorway South - Lane restrictions in place due to a vehicle fire.
Provisional dates:
From: Monday 02 April 2018
To: Wednesday 31 March 2021
Last updated 14:29 Monday 09 December 2019
Works | TfL Works
Vauxhall Bridge, Bridg - Repainting and waterproofing
From: Tuesday 03 December 2019
To: Tuesday 10 December 2019
Last updated 17:47 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A5109] Marsh Lane (NW7) (All Directions) at the junction of Highwood Hill - Temporary traffic signals in operation to facilitate emergency Cadent Gas works.
From: Monday 25 November 2019
To: Friday 13 December 2019
Last updated 19:54 Monday 09 December 2019 : Traffic is flowing well.
Works | Borough
[A400] Gower Street (WC1E) (Southbound) between Grafton Way and Bedford Square - There are restrictions in place to facilitate resurfacing works.
From: Tuesday 19 November 2019
To: Friday 20 December 2019
Last updated 19:17 Monday 09 December 2019 : Delays are possible.
Works | Borough
[A400] Kentish Town Road (NW1) (All Directions) at the junctions of both Hawley Road and Hawley Crescent - Temporary traffic signals in operation during public realm works on behalf of Camden council.
From: Sunday 21 July 2019
To: Friday 20 December 2019
Last updated 16:23 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A217] London Road (All Directions) at the junction of Streatham Road - Various restrictions in place to facilitate the removal of a roundabout and construction of a junction.
From: Saturday 20 July 2019
To: Friday 05 March 2021
Last updated 19:11 Monday 09 December 2019 : Delays are possible.
Works | Other
[A503] Ferry Lane (N17) (All Directions) at the junction of Jarrow Road - Contractors working on the Ferry Lane development will be carrying out works to install barriers along the central reservation on Ferry Lane. These are being installed for the duration of the development until 2021 to protect the site and safety of the travelling public and to stop any overtaking on Ferry Lane.
From: Friday 04 October 2019
To: Friday 31 January 2020
Last updated 16:03 Monday 09 December 2019 : Traffic delays are possible.
Works | Other
Fenchurch Street (EC3N) (All Directions) at the junction of Leadenhall Street - Temporary signals in operation due to works.
From: Monday 21 October 2019
To: Friday 28 February 2020
Last updated 16:12 Monday 09 December 2019 : Delays are possible.
Works | Borough
[A104] Markhouse Road (E10) (Northbound) between Boundary Road and Lea Bridge Road - Lane restrictions in operation to facilitate works by Waltham Forest Council.
From: Monday 28 January 2019
To: Wednesday 30 November 2022
Last updated 16:06 Monday 09 December 2019 : Delays are possible.
Special and Planned Events | Construction Activity
Soho Place, [A400] Charing Cross Road (WC2) (Northbound) at the junction of Sutton Row and [A40] St Giles High Street - Lane restrictions and heavier traffic flow than usual expected until approximately late 2021 during works related to the "Soho Place" development.
From: Monday 30 September 2019
To: Thursday 20 February 2020
Last updated 18:38 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A312] Mandeville Road (UB5) (Both Directions) at the junction of Eastcote Lane North - The carriageway is restricted to facilitate Affinity Water works.
From: Sunday 08 September 2019
To: Monday 23 December 2019
Last updated 19:01 Monday 09 December 2019 : Delays are possible.
Works | Other
[A4127] Greenford Road (UB6) (All Directions) at the junction of Rockware Avenue - Three way temporary traffic signals for urgent bridge repair works. Phase 2: From 0500 Monday 25 November 2019 until 1800 Monday 23 December 2019 Greenford Road northbound will have lane restrictions with a contraflow in place
From: Tuesday 05 November 2019
To: Ongoing
Last updated 15:03 Monday 09 December 2019 : There are no reported delays.
Infrastructure Issue | Signal Timing
[A598] Finchley Road (NW11) (All Directions) at the junction of Golders Green Road - Traffic signals are on local control timings.
From: Tuesday 03 December 2019
To: Thursday 12 December 2019
Last updated 20:46 Monday 09 December 2019 : Traffic is slow northbound from Romford Road and southbound from Capel Road.
Works | Utility
Forest Lane (E15/E7) (All Directions) at the junction of Woodgrange Road - Temporary traffic signals in place to facilitate Thames Water works.
From: Monday 09 December 2019
To: Friday 20 December 2019
Last updated 19:59 Monday 09 December 2019 : Traffic is slow on approach in both directions.
Works | Other
[A1] Archway Road (N6) (Northbound) between Muswell Hill Road and Bishops Road - A contraflow is in place due to Thames Water works
From: Monday 09 December 2019
To: Sunday 15 December 2019
Last updated 19:39 Monday 09 December 2019 : No restrictions in place.
Works | Utility
[A11] Whitechapel Road (E1) (Westbound) at the junction of Cavell Street - Lane one closed to facilitate utility works.
From: Wednesday 20 November 2019
To: Friday 13 December 2019
Last updated 16:08 Monday 09 December 2019 : Delays are possible.
Works | Emergency
[A11] Bow Road (E3) (Both Directions) at the junction of Kitcat Terrace - Lane two (of two) is closed for emergency Thames Water works.
From: Wednesday 02 October 2019
To: Friday 13 December 2019
Last updated 16:01 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A13] Commercial Road (E14) (Eastbound) at the junction of Burdett Road - Lane three (of four) is closed due to Cadent gas works.
From: Wednesday 04 December 2019
To: Wednesday 11 December 2019
Last updated 14:40 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A13] Commercial Road (E14) (Eastbound) at the junction of Brunton Place, Limehouse - Lane one (bus lane) (of two) closed during the emergency repair of a burst water main.
From: Monday 09 December 2019
To: Monday 23 December 2019
Last updated 17:51 Monday 09 December 2019 : There are no reported delays.
Works | Other
[A20] Lewisham Way (SE4) (Westbound) at the junction of Breakspears Road - There will be a lane restriction in place due to works in the area.
From: Monday 11 November 2019
To: Friday 20 December 2019
Last updated 16:05 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A202] Camberwell Church Street (SE5) (All Directions) at the junction of [A215] Camberwell Road (Camberwell Green) - Various lane restrictions during the "Camberwell Town Centre Scheme".
From: Monday 02 December 2019
To: Wednesday 18 December 2019
Last updated 21:11 Monday 09 December 2019 : Traffic is flowing well. Use an alternative route.
Works | TfL
[A205] Academy Road (All Directions) between Shooters Hill and Ha Ha Road - Road closed southbound due to resurfacing works. There are also temporary traffic signals in place and lane closures on other approaches. (20:00 - 05:00 Monday - Thursday and Sunday nights only)
From: Monday 09 December 2019
To: Tuesday 17 December 2019
Last updated 21:15 Monday 09 December 2019 : Use caution.
Works | TfL
[A205] Upper Richmond Road (SW15/SW13) (All Directions) at the junction of Priest Bridge, Gilpin Avenue and Palewell Park - Temporary traffic signals in place to facilitate nightly resurfacing works (21:00-05:00).
From: Tuesday 19 November 2019
To: Ongoing
Last updated 17:31 Monday 09 December 2019 : Delays are possible.
Hazard(s) | Burst Water Main
Lewisham High Street (SE13) (Northbound) at the junction of Whitburn Road - Surface water due to a burst water main.
From: Thursday 03 August 2017
To: Tuesday 31 March 2020
Last updated 15:23 Monday 09 December 2019 : Traffic delays are possible.
Works | TfL
[A23] Kennington Road (SE11) (Northbound) at the junction of Clayton Street - The road has been reduced to one lane in both directions for London Underground upgrade works.
From: Monday 02 December 2019
To: Tuesday 10 December 2019
Last updated 20:10 Monday 09 December 2019 : There are no reported delays.
Works | Utility
[A22] Godstone Road (CR8) (All Directions) at the junction of St James' Road - Single alternate lane working under temporary traffic signal control between approximately 20:00 and 05:00 each night during SES Water works.
From: Monday 09 December 2019
To: Tuesday 17 December 2019
Last updated 20:40 Monday 09 December 2019 : Use caution.
Works | Utility
[A24] Morden Road (SW19) (Southbound) between Jubilee Way and Lombard Road - Lane one closed between 20:00 and 05:00 during overnight O2 works. Additionally, London Power Networks are also undertaking works the night of Monday 9 December, only.
From: Tuesday 26 March 2019
To: Friday 31 December 2021
Last updated 16:31 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A3205] Nine Elms Lane (SW11/SW8) (All Directions) at the junction of Ponton Road - Various lane closures in place for Thames Tideway Works.
From: Friday 06 December 2019
To: Ongoing
Last updated 17:59 Monday 09 December 2019 : Approach with caution.
Infrastructure Issue | Traffic Signal
[A3205] Battersea Park Road (SW11) (All Directions) at the junction of Alexandra Avenue - The traffic signals are not working at this location.
From: Saturday 21 September 2019
To: Friday 13 December 2019
Last updated 17:29 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A3205] Battersea Park Road (SW8) (Westbound) at the junction of Thessaly Road - Various restrictions during Northern line extension-related works. Monday 18 November until Friday 13 December, inclusive, various lane restrictions reducing the carriageway to a single lane in both directions.
From: Friday 06 December 2019
To: Wednesday 18 December 2019
Last updated 16:14 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A3205] Nine Elms Lane (Westbound) opposite the junction of Cringle Street - Reduced to a single lane during UKPN works.
From: Sunday 18 August 2019
To: Friday 20 December 2019
Last updated 16:04 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A315] Knightsbridge (SW1) (Both Directions) at the junction of Trevor Street - Lane restrictions are in place for essential gas main replacement works.
From: Monday 09 December 2019
To: Ongoing
Last updated 15:02 Monday 09 December 2019 : Approach with caution.
Traffic Incidents | Breakdown
[A40] Westway (W2/W10) (Eastbound) near Westbourne Park LU station.
From: Monday 09 December 2019
To: Ongoing
Last updated 15:30 Monday 09 December 2019 : Approach with caution.
Hazard(s) | Flooding
[A40] Western Avenue (Westbound) between Target Underpass (A40) and Polish War Memorial Underpass (A40) - There are reports of surface water in lane one (of three) due to a burst water main.
From: Monday 09 December 2019
To: Ongoing
Last updated 20:42 Monday 09 December 2019 : Approach with caution.
Hazard(s) | Spillage
[A406] Beckton Roundabout (A406 / A13) (E6) (Westbound) - There are report of a diesel spillage at this location.
From: Monday 09 December 2019
To: Ongoing
Last updated 15:55 Monday 09 December 2019 : Approach with caution.
Hazard(s) | Collapsed Manhole
[A406] Great North Way (Barnet By Pass) (NW4) (Eastbound) at the junction of Southbourne Crescent - There are reports of a broken manhole cover at this location.
From: Monday 23 September 2019
To: Friday 01 October 2021
Last updated 18:16 Monday 09 December 2019 : Delays are possible.
Works | Other
[A41] Avenue Road (NW3) (Southbound) at the junction of Swiss Cottage - Lane one (of four) is closed due to building works.
From: Wednesday 04 December 2019
To: Friday 13 December 2019
Last updated 15:57 Monday 09 December 2019 : Delays are possible.
Works | Utility
A200 St Thomas Street (SE1)(Eastbound) at the junction of Borough High Street - Carriageway restrictions in place to facilitate Virgin Media works.
From: Monday 04 February 2019
To: Tuesday 24 December 2019
Last updated 16:06 Monday 09 December 2019 : Delays are possible.
Special and Planned Events | Construction Activity
Pentonville Road (N1) (Eastbound) at the junction of King's Cross Bridge and Gray's Inn Road - The footway is closed for construction work.
From: Monday 09 December 2019
To: Ongoing
Last updated 20:54 Monday 09 December 2019 : Traffic flows are not currently being affected however care is required on the approach.
Hazard(s) | Burst Water Main
[A501] Marylebone Road (NW1) (Westbound) at the junction of Great Portland Street - There is a burst water main at this location, subsequently the road surface is in poor condition.
From: Monday 25 November 2019
To: Sunday 26 January 2020
Last updated 16:03 Monday 09 December 2019 : Delays are possible.
Works | Other
[A4200] Eversholt Street (Both Directions) at the junction of Phoenix Road - Temporary traffic signals in operation during HS2-related water works. Location to move steadily southbound as works progress.
From: Monday 09 December 2019
To: Friday 13 December 2019
Last updated 14:51 Monday 09 December 2019 : Expect delays.
Works | Utility
[A201] New Kent Road (SE1) (Westbound) at the junction of Rodney Place - Lane one closed to facilitate Thames Water works.
From: Monday 25 November 2019
To: Friday 17 January 2020
Last updated 15:58 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A400] Gower Street (WC1E/NW1) (Southbound) at the junction of Euston Road - The road is reduced to a single lane to facilitate HS2 works.
From: Monday 25 June 2018
To: Monday 13 April 2020
Last updated 16:07 Monday 09 December 2019 : Delays are possible.
Special and Planned Events | Construction Activity
[A3212] Millbank Roundabout (SW1) (All Directions) junction with [B323] Horseferry Road and Lambeth Bridge - The carriageway is restricted for construction work.
From: Saturday 23 November 2019
To: Wednesday 08 January 2020
Last updated 15:58 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A308] King's Road (All Directions) at the junctions of both [A3220] Gunter Grove and [A3220] Edith Grove - Lane restrictions and temporary signals in operation during junction improvement works.
From: Friday 06 December 2019
To: Tuesday 10 December 2019
Last updated 15:27 Monday 09 December 2019 : Restrictions remain in operation, care is required on approach.
Works | Utility
A3212 Chelsea Bridge Road (SW11/SW3/SW1W) (Southbound) at the junction of Chelsea Embankment - Lane one (of two) is closed due to Thames Water works.
From: Monday 18 November 2019
To: Friday 14 February 2020
Last updated 18:52 Monday 09 December 2019 : Delays are possible.
Works | Borough
[A400] Junction Road (N19) (All Directions) at the junction of [A5200] Brecknock Road, by Tufnell Park station - Single alternate lane working under five-way temporary traffic signal control until approximately mid-February during junction improvement works on behalf of Camden council.
From: Monday 09 December 2019
To: Ongoing
Last updated 19:25 Monday 09 December 2019 : Traffic is flowing well, however care is advised on approach with pedestrians crossing.
Infrastructure Issue | Traffic Signal
[A218] Merton Road (SW18) (All Directions) at the junction of Kimber Road - Traffic signals have been twisted following a collision.
From: Monday 09 December 2019
To: Tuesday 10 December 2019
Last updated 20:41 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A232] Croydon Road (SM6) (All Directions) at the junction of The Holt - Two way signals in operation due to works by BT.
From: Monday 09 December 2019
To: Ongoing
Last updated 21:03 Monday 09 December 2019 : Traffic is flowing well.
Special and Planned Events | Sporting
West Ham FC, London Stadium - West Ham v Arsenal, kick-off 2000hrs . Expect large numbers of pedestrian traffic in the area.
From: Monday 02 December 2019
To: Friday 13 December 2019
Last updated 19:12 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A400] Hampstead Road (NW1) (Northbound) at the junction of Varndell Street - There will be a lane restriction in place due to water works.
From: Monday 02 December 2019
To: Monday 23 December 2019
Last updated 19:14 Monday 09 December 2019 : Delays are possible.
Works | Borough
North Road (N7) (All Directions) at the junction of Goodinge Road - There will be temporary signals in operation due to works in the area.
From: Monday 09 December 2019
To: Ongoing
Last updated 21:06 Monday 09 December 2019 : Several emergency response vehicles are parked along the road, care is required on the approach.
Traffic Incidents | Emergency Services Incident
[A400] Northumberland Avenue (WC2N) (Eastbound) at the junction of Trafalgar Square - The road is partially obstructed by an emergency services incident.
From: Monday 09 December 2019
To: Wednesday 30 September 2020
Last updated 17:57 Monday 09 December 2019 : Traffic is flowing well.
Works | TfL
[A200] Creek Road (SE8/SE10) (Both Directions) between Greenwich Quay and Deptford Church Street - There will be various restrictions in place due to Cycle Superhighway works.
From: Sunday 07 October 2018
To: Sunday 01 March 2020
Last updated 18:15 Monday 09 December 2019 : Delays are possible.
Works | Other
[A400] Hampstead Road (NW1) (Both Directions) between Granby Terrace and Robert Street - Various restrictions during HS2-related works. The bus lane is closed northbound. Temporary traffic signals are operating at Granby Terrace.
From: Thursday 14 November 2019
To: Friday 20 December 2019
Last updated 18:16 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A404] Hillside (All Directions) at the junction of Craven Park - Temporary signals in operation for traffic signals modernisation works.
From: Monday 09 December 2019
To: Friday 13 December 2019
Last updated 17:46 Monday 09 December 2019 : Traffic is flowing well.
Works | Utility
[A503] Seven Sisters Road (N7) (Eastbound) at the junction of Hertslet Road - Lane closures to facilitate Thames Water works.
From: Wednesday 06 November 2019
To: Saturday 14 December 2019
Last updated 18:28 Monday 09 December 2019 : Traffic delays are possible.
Works | Utility
[A3217] Eaton Square (SW1W) (All Directions) at the junction of Eccleston Street - Temporary traffic signals are in place to facilitate Cadent Gas works.
From: Monday 19 August 2019
To: Friday 20 December 2019
Last updated 16:04 Monday 09 December 2019 : Traffic delays are possible.
Special and Planned Events | Construction Activity
[A40] Holborn (Eastbound) at the junction of Brooke Street - Various restrictions may be in place to facilitate building works
From: Tuesday 26 November 2019
To: Tuesday 31 December 2019
Last updated 19:12 Monday 09 December 2019 : Delays are possible.
Works | Other
[A503] Seven Sisters Road (N4) (Westbound) at the junction of [A503] Isledon Road - Lane one (of two) and the footway is closed due to scheduled works.
From: Tuesday 29 October 2019
To: Friday 13 December 2019
Last updated 18:14 Monday 09 December 2019 : Delays are possible.
Works | Borough
[B452] Drayton Green Road (W13) (All Directions) at the junction of Hastings Road - Single alternate lane working under temporary traffic signal control during road works on behalf of Ealing council.
From: Friday 29 November 2019
To: Thursday 12 December 2019
Last updated 19:16 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A105] Green Lanes (N4) (Both Directions) at the junction of Salisbury Road - Contraflow in operation during works at the location.
From: Monday 02 December 2019
To: Friday 13 December 2019
Last updated 19:38 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A112] Leyton Road (E15) (All Directions) at the junction of Alma Street - Temporary traffic signals in place to faciltate utility works.
From: Tuesday 03 December 2019
To: Friday 20 December 2019
Last updated 19:15 Monday 09 December 2019 : Delays are possible.
Works | TfL
[A1010] Hertford Road (EN3) (All Directions) at the junction of Tyberry Road - Temporary traffic signals to facilitate cycle scheme works.
From: Monday 21 October 2019
To: Wednesday 11 March 2020
Last updated 15:58 Monday 09 December 2019 : Delays are possible.
Works | Borough
Forest Lane (E15) (All Directions) at the junction of Water Lane - There are temporary traffic signals at this location due to Crossrail works, public realm and interchange improvements.
From: Monday 02 December 2019
To: Saturday 14 December 2019
Last updated 15:13 Monday 09 December 2019 : Traffic delays may occur on the approach to the temporary signals in both directions.
Works | Borough
[A3214] Buckingham Palace Road (All Directions) at the junction of Ebury Bridge Road - There are temporary signals in operation due to works.
From: Thursday 05 December 2019
To: Wednesday 11 December 2019
Last updated 21:09 Monday 09 December 2019 : Traffic is flowing well.
Works | Utility
[A124] Barking Road (E13) (All Directions) between King Street and Croydon Road - Temporary signals in place during gas works.
From: Thursday 05 December 2019
To: Wednesday 11 December 2019
Last updated 18:37 Monday 09 December 2019 : There are no reported delays.
Works | Utility
[B453] Neasden Lane (NW10) (All Directions) at the junction of Dog Lane - There will be temporary signals in operation due to Thames Water works.
From: Wednesday 27 November 2019
To: Ongoing
Last updated 19:48 Monday 09 December 2019 : Approach with caution. Traffic is flowing well.
Hazard(s) | Collapsed Manhole
[A503] Camden Road (NW1/NW5) (All Directions) between St Pancras Way and Sandall Road - Lane one (of two) blocked to facilitate the repair of a collapsed manhole cover.
From: Friday 06 December 2019
To: Monday 09 December 2019
Last updated 15:56 Monday 09 December 2019 : Delays are possible on the approach.
Works | Emergency
[A3217] King's Road (SW3) (All Directions) at the junction of Old Church Street - There are temporary signals in operation to facilitate emergency gas works.
From: Monday 29 October 2018
To: Thursday 23 December 2021
Last updated 16:25 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A2209] Deptford Church Street (SE8) (Both Directions) at the junction of Bronze Street - Contraflow in place reducing both directions to one lane for Thames Tideway works.
From: Saturday 07 December 2019
To: Ongoing
Last updated 19:45 Monday 09 December 2019 : Approach with caution. Delays are possible.
Infrastructure Issue | Traffic Signal
[A1010] Fore Street (N9) (All Directions) at the junction of The Broadway - The traffic lights at this location are all out..
From: Monday 09 December 2019
To: Thursday 12 December 2019
Last updated 17:39 Monday 09 December 2019 : There are no reported delays.
Works | TfL
[B273] Green Lane (SW16) (All Directions) at the junction of Hermitage Lane - Temporary traffic signals in operation to facilitate the construction of bus facilities.
From: Monday 09 December 2019
To: Tuesday 10 December 2019
Last updated 20:49 Monday 09 December 2019 : Expect delays when restrictions apply.
Works | Borough
[A5] Maida Vale (W9) (Southbound) between Elgin Avenue and Sutherland Avenue - Road closed overnight to facilitate resurfacing works.
From: Sunday 08 December 2019
To: Ongoing
Last updated 17:47 Monday 09 December 2019 : There are no reported delays.
Works | Emergency
Oldfield Lane North (UB6) (All Directions) at the junction of Station Approach - Temporary traffic signals at this location to facilitate repairs to a burst water main.
From: Sunday 08 December 2019
To: Thursday 12 December 2019
Last updated 21:09 Monday 09 December 2019 : Traffic is flowing well.
Works | Utility
[A107] Lower Clapton Road (E5) (All Directions) at the junction of Powerscroft Road - Temporary signals in place for gas works.
From: Monday 02 December 2019
To: Friday 13 December 2019
Last updated 19:10 Monday 09 December 2019 : Delays are possible.
Works | Utility
[A109] Station Road (N11) (All Directions) at the junction of Woodland Road - Temporary traffic signals in place to facilitate UKPN works.
From: Tuesday 17 September 2019
To: Friday 20 December 2019
Last updated 15:56 Monday 09 December 2019 : Delays are possible.
Works | TfL
Linton Road (IG11) (All Directions) at the junction of Cambridge Road and George Street - There are temporary traffic signals controlling signal modernisation and upgrade works at this location.
From: Thursday 13 June 2019
To: Saturday 30 May 2020
Last updated 16:13 Monday 09 December 2019 : Delays are possible.
Works | Borough
[A1006] Blackhorse Road (All Directions) at the junction of Forest Road - Temporary traffic signals in place to facilitate borough works to take place.